Trash Bin T-Molding

 Trash bin tops need to be routed and T-molded before shipping. This gives a nice finished look where the trash bin sits and helps protect that edge when changing the trash bag.Start by routing a groove along the interior perimeter with a T-slot cutter making sure to stay level and centered on the material.Prepare your […]

Continue reading

Arachnid Target Back Assembly

Arachnid Target Back Assembly Start by collecting all parts and tools needed With target back on your bench take 4 pound in T-nuts(B083210T) and insert into holes A-D Using the drill with allen driver screw in 3 hex drive inserts into holes 1-3 making sure to stop just below the surface. Sand face if necessary […]

Continue reading

Redline Vertical Extensions

Sometimes agents need verticals to be taller than 8ft. This is the procedure for machining the parts needed to make an extension.Each vertical is unique to its depth. The depth used for this example will be 350mm. This depth is found on the part label.If this is a depth we have not done in the […]

Continue reading

Nardi Tops Procedure

Nardi Tops Procedure Does material need to be cut down before going to CNC? If so the beam saw needs to process into appropriate sizes. CNC operator needs to review the paperwork to see which programs are to be run and that they have been supplied with the appropriate material. Is the laminate correct? (Appears […]

Continue reading

3D Pop-Up Shade Assembly

3D Pop-Up Shade Assembly Gather parts Insert glue into (4) 8mm holes and insert dowels Apply additional glue to dowels and push blocks onto dowels Flip part over, predrill and install 1 screw into each block Rotate part onto side with holes towards top. Put ¼” back on with glue and ½” pin nails. Should […]

Continue reading

Cellular Shades Assembly

Cellular Shades Assembly Gather parts Apply glue to holes and insert dowels Apply glue to block holes and push right block onto dowels Install ½” back into dado before pushing left block onto dowels Nail from end into back using 1” pin nail Predrill and insert 1 screw into each block and 2 screws into […]

Continue reading

National Lab

National Lab Tops When starting a National Lab cutlist review the sizes and make a plan for which stock sizes will be used to maximize yield. Example of this would be if you have 4-24”x60” tops to cut you should use a 4’x10’ sheet instead of 2-4’x8’ sheets When loading panels into the saw use […]

Continue reading

Redline Corner Shelves Procedure

Stack all parts on cardboard so the inside edges are aligned Place filler sticks on the top edge to block the overspray Cut banding pieces to length and tape down to a piece of cardboard Apply contact adhesive to both the shelves and the banding Allow adhesive to set up until dry to touch (3-7mins) […]

Continue reading